Our House

Our never ending quest to find the right house solution

Archive for June 22nd, 2009

Temporary roofing

Wadly and his brother built a roof over the Airstream to keep the rain and sun off.  One side of the roof is fastened to the living room, the other rests on posts and pier blocks.  The lumber came from left overs and recycled bits from the carports Wadly disassembled when he was preparing to move his shop. The new roof is put together with screws so it can easily be taken apart.  The roofing is a combo of green and creme, channeled and ripple, but it’s gonna keep us cool/warm/dry and it’s temporary.  From a distance it doesn’t look too bad . . . <grin>

Just today Wadly filled the roof vents of the Airstream (a HUGE source of heat loss) with foam and screwed solid covers on.  We’re having a spate of cooler weather and I can already feel a difference.  I won’t appreciate it so much during the bits of warmer weather, but I can’t blame Wadly for not wanting to wait until fall.  It doesn’t get that warm here that we will be uncomfortable during the rest of the summer.

Posted: Monday, June 22nd, 2009 @ 9:09 pm in House2 Construction | No Comments »

Diggin’ and a-diggin’

I’ve been excavating the new bedroom location.  Wadly used Terry’s excavator to do the rough digging and I’ve been doing the clean-out and leveling.  I’ve had to stop and wait for Wadly and his brother to reblock the end of the living room.  I have to excavate under the corner of the living room for the bedroom foundation and the current blocking has the support right at the corner.  That won’t work.  If I undercut it the living room will have nothing supporting that corner.  Support first, dig after.

I’m getting a little antsy for having to wait so long so I’m going to work on digging more of the foundation.  I can get the other two sides of the foundation dug and start prepping the rubble trench.

Posted: Monday, June 22nd, 2009 @ 8:59 pm in House2 Construction | No Comments »