Diggin’ and a-diggin’

I’ve been excavating the new bedroom location.  Wadly used Terry’s excavator to do the rough digging and I’ve been doing the clean-out and leveling.  I’ve had to stop and wait for Wadly and his brother to reblock the end of the living room.  I have to excavate under the corner of the living room for the bedroom foundation and the current blocking has the support right at the corner.  That won’t work.  If I undercut it the living room will have nothing supporting that corner.  Support first, dig after.

I’m getting a little antsy for having to wait so long so I’m going to work on digging more of the foundation.  I can get the other two sides of the foundation dug and start prepping the rubble trench.

This entry was posted in House2 Construction. Bookmark the permalink.

Leave a Reply